Planetary Engineers and construction

General discussion related to the game goes here.

Moderators: Balthagor, Moderators

Post Reply
fpg
Warrant Officer
Posts: 30
Joined: Jun 05 2024
Human: Yes

Planetary Engineers and construction

Post by fpg »

Planetary Engineers order can be set to construction. However this seem to concern planet surface construction and not orbital construction. I tried to speed up orbital facility construction by sending a planetary engineer and it did not do anything (nor did it consume the engineer). Is that the intended behavior and why not help build an orbital facility with planetary engineers ?
User avatar
Balthagor
Supreme Ruler
Posts: 22323
Joined: Jun 04 2002
Human: Yes
Location: BattleGoat Studios

Re: Planetary Engineers and construction

Post by Balthagor »

I'll need to double check our design documents, but IIRC the intended design is to speed up constructions. We'll do some testing. Ticket 36527.
Chris Latour
BattleGoat Studios
chris@battlegoat.com
User avatar
Balthagor
Supreme Ruler
Posts: 22323
Joined: Jun 04 2002
Human: Yes
Location: BattleGoat Studios

Re: Planetary Engineers and construction

Post by Balthagor »

We've done some testing and found that placing engineers next to facilities in construction does speed up their progress, both and planet and system level. Could you provide more details on the issue you're seeing?
Chris Latour
BattleGoat Studios
chris@battlegoat.com
fpg
Warrant Officer
Posts: 30
Joined: Jun 05 2024
Human: Yes

Re: Planetary Engineers and construction

Post by fpg »

Balthagor wrote: Jul 09 2024 We've done some testing and found that placing engineers next to facilities in construction does speed up their progress, both and planet and system level.
I see. I think I misunderstood how engineers "Construction" order works. I thought that "Construction" meant that the Engineer was consumed in order to speed up facility construction.
Generally speaking it's not always easy to check that the order one issues is well taken into account. User feedback should be the rule, thus asking for construction assist, a message like "Construction order set" should appear after issuing the order. And once the engineer is in position to assist construction a notification could be helpful.
Another rule could be that once an engineer is near a facility being built, assistance is automatic, no need for a specific order.
Post Reply

Return to “General Discussion - GR”