Hello.
Having three metal ore i see my daily production of metal ore is 3493 tons.
The game is paused. But installed capacity information shows me that one metal ore product 1048 tons and two others 1820.
Hence actually i have 1048+1820 = 2868 tons production of metal ore. What is the reason of such difference of numbers?
Thank's for any help.
mismatch of numbers
Moderators: Balthagor, Legend, Moderators
-
- Corporal
- Posts: 3
- Joined: Oct 24 2019
- Human: Yes
- Balthagor
- Supreme Ruler
- Posts: 22099
- Joined: Jun 04 2002
- Human: Yes
- Location: BattleGoat Studios
Re: mismatch of numbers
It would be easier to answer if I could look at your savegame. Could you please zip it and email it to us? Please include ticket 23745 in the subject line.
-
- Colonel
- Posts: 417
- Joined: Sep 07 2019
- Human: Yes
Re: mismatch of numbers
It would be even more easier if you start up your game, load a region with a singe coal or metal mine, mouse over it with same facility and compare that production to your domestic market production. Atleast if you want to answer the topic.
Another example would be Kuwait in GC2020 that got 1 med cg facility, which shows 223 production, but in your domestic production tab you produce 274.
Another example would be Kuwait in GC2020 that got 1 med cg facility, which shows 223 production, but in your domestic production tab you produce 274.